Our First Work Day
Thanks to the eleven guys and one gal that the Lord gave “a mind to work” on the future Parkland Chapel last Saturday. Half of the outside of the building is painted. The foyer, sanctuary, and hall leading to the children’s classrooms are framed, wired, and nearly dry walled. The children’s rooms and fellowship area are half of the way framed as well. Special thanks to the ladies who brought out the lunch. Enjoy the pics. God bless, Mike
|
|
|
Sanctuary From Front Door
|
|
|
|
|
|
Kids Rooms/Fellowship Area Before
|
|
|
|
|
Tear Down Before We Build
|
|
|
|
|
Painting Outside of the Building
|
|
|
|
|
|
Steve Cooper Moving Light Fixtures
|
|
|
|
|
Three Amigos Framing the Sanctuary
|
|
|
|
|
|
|
Our Crew Leader Dan Robbins Framing Away
|
|
|
|
|
Jeff Speth Looking the Part
|
|
|
|
|
|
Drywalling the Soundbooth
|
|
|
|
|
Framing Side Door from Stage to Hallway
|
|
|
|
|
|
|
The Girls Brighten Our Day
|
|
|
|
|
Sanctuary is coming Together
|
|
|
|
|
Working on Hall from Foyer to Childrens Area
|
|
|
|
Written by Mike Harrison · Filed Under News
Tagged:
Comments
Got something to say?